av免费在线-av免费在线播放网址-av免费在线观看的网址-av免费在线观看一区二区三区-av喷水高潮喷水在线观看-av喷水高潮喷水在线观看c

阻燃防火材料-網(wǎng)上貿(mào)易平臺 | | WAP瀏覽
服務(wù)熱線:4006555305

ASTM E2047光電陣列濕絕緣完整性試驗的標(biāo)準(zhǔn)試驗方法

放大字體  縮小字體 發(fā)布日期:2012-02-08   瀏覽次數(shù):202  分享到: 分享到騰訊微博
ASTM E2047光電陣列濕絕緣完整性試驗的標(biāo)準(zhǔn)試驗方法
ASTM E2047  Standard Test Method for Wet Insulation Integrity Testing of Photovoltaic Arrays
ASTM E2047光電陣列濕絕緣完整性試驗的標(biāo)準(zhǔn)試驗方法
The design of a PV module or system intended to provide safe conversion of the sun's radiant energy into useful electricity must take into consideration the possibility of hazard should the user come into contact with the electrical potential of the array. In addition, the insulation system provides a barrier to electrochemical corrosion, and insulation flaws can result in increased corrosion and reliability problems. This test method describes a procedure for verifying that the design and construction of the array provides adequate electrical isolation through normal installation and use. At no location on the array should the PV-generated electrical potential be accessible, with the obvious exception of the output leads. The isolation is necessary to provide for safe and reliable installation, use, and service of the PV system.
This test method describes a procedure for determining the ability of the array to provide protection from electrical hazards. Its primary use is to find insulation flaws that could be dangerous to persons who may come into contact with the array. Corrective action taken to address such flaws is beyond the scope of this test method.
This procedure may be specified as part of a series of acceptance tests involving performance measurements and demonstration of functional requirements. Large arrays can be tested in smaller segments. The size of the array segment to be tested (called “circuit under test” in this test method) is usually selected at a convenient break point and sized such that the expected resistance or current reading is within the middle third of the meter's range.
Insulation leakage resistance and insulation leakage current leakage are strong functions of array dimensions, ambient relative humidity, absorbed water vapor, and other factors. For this reason, it is the responsibility of the user of this test method to specify the minimum acceptable leakage resistance for this test.
Even though a numerical quantity is specified, actual results are often pass-fail in that when a flaw is found, the leakage current changes from almost nothing to the full scale value on the meter.
The user of this test method must specify the option used for connection to the array during the test. The short-circuited option requires a shorting device with leads to connect the positive and negative legs of the circuit under test. For larger systems, where the shorting device may have to be rated for high current and voltage levels, the open-circuited option may be preferred. The open-circuited option requires the user to correct readings to account for the PV-generated voltage, and the procedure for making such corrections is beyond the scope of this test method. The short-circuited option may be easier for small systems where the voltage and current levels are low and the distance between the plus and minus leads of the circuit under test are small. The short-circuited option minimizes the chance of exposing array components to voltage levels above those for which they are rated.
1. Scope
1.1 This test method covers a procedure to determine the insulation resistance of a photovoltaic (PV) array (or its component strings), that is, the electrical resistance between the array's internal electrical components and is exposed, electrically conductive, non-current carrying parts and surfaces of the array.
1.2 This test method does not establish pass or fail levels. The determination of acceptable or unacceptable results is beyond the scope of this test method.
1.3 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

2. Referenced Documents (purchase separately)
ASTM Standards
E772 Terminology Relating to Solar Energy Conversion
E1328 Terminology Relating to Photovoltaic Solar Energy Conversion
E1462 Test Methods for Insulation Integrity and Ground Path Continuity of Photovoltaic Modules
Index Terms
electrical testing; insulation integrity; insulation resistance; photovoltaics; solar energy; Electrical performance--solar devices; Insulation resistance; Photovoltaic (PV) power systems; Solar energy; Wet insulation integrity;


  詳情請咨詢
  防火資源網(wǎng)-阻燃防火測試中心
  電話:(+86)0592-5056213
  傳真:(+86)0592-5105807
  郵件:firetest@firetc.com

凡注明"防火資源網(wǎng)"的所有作品,由<防火資源網(wǎng)>整理編輯,任何組織未經(jīng)<防火資源網(wǎng)>及其擁有者授權(quán),不得復(fù)制、轉(zhuǎn)載、摘編或利用其它方式應(yīng)用于任何商業(yè)行為。

 
 
[ 防火測試中心搜索 ]  [ ]  [ 告訴好友 ]  [ 打印本文 ]  [ 關(guān)閉窗口 ]  [ 返回頂部 ]

 

 
 
推薦防火測試
推薦圖文
點擊排行
 
 
網(wǎng)站首頁 | 廣告服務(wù) | 關(guān)于我們 | 聯(lián)系方式 | 服務(wù)協(xié)議 | 版權(quán)聲明 | 網(wǎng)站地圖 | 友情鏈接 | 網(wǎng)站留言 | 舊版本 | 閩ICP備09009213號
?2019-2021 FIRETC.COM All Rights Reserved ? 備案號:在線客服 點擊QQ交談/留言 點擊QQ交談/留言
主站蜘蛛池模板: 精品日韩欧美一区二区在线播放 | 丁香婷婷综合网 | 日产精品卡二卡三卡四卡区 | 亚洲九九夜夜国产成人精品综合久久 | 国产av国片精品jk制服 | 高潮毛片又色又爽免费 | 日本极品少妇xxxx | 亚洲高清国产拍精品动图 | 国产成人麻豆精品午夜福利在线 | 成在线观看无码一区二区三区 | 成熟交BGMBGMBGM日本 | 久久精品岛国av一区二区无码 | 亚洲国产一区成人 | 内射人妻视频国内 | 精品人妻无码一区二区三区三级 | 无码国产精品午 | 无码亚欧激情视频在线观看 | 亚洲人成影院在线观看 | 国产欧美一区二区精品久 | 无码人妻丰满熟妇区免费 | 交换娇妻呻吟HD中文字幕 | 丰满少妇被粗大的猛烈进出视频 | 精品免费第一区二区三区 | 日韩精品无码一区二区 | 久久精品国产亚洲a∨香蕉 久久精品国产亚洲a∨麻豆 | 卡一卡二卡三无人区 | 亚洲午夜久久久久中文字幕久久 | 97国产精品视频免费观看 | 国产又色又爽又黄的免费站 | 日韩免费av在线 | 亚洲天堂日韩欧美在线 | 四虎国产精品永久免费网址 | 中文字幕人妻少妇无码不 | 好紧好湿好爽免费视频在线观看 | 无码不卡中文字幕av | 亚洲午夜精品久久久久久抢 | 亚洲国产精品无码专区成人 | 亚洲欧美国产国产一区第二页 | 亚洲av无码一区二区三区在线播放 | 国亚洲欧美日韩精品 | 免费人妻aⅴ无码专 |